Significance and Use
4.1 The rational for developing a separate standard practice for Aerial Adventure Courses is based on the unique functional, operational and patron participation requirements when compared to amusement rides and devices.
4.2 The purpose of this practice is to provide designers, manufacturers, owners/operators and auditors with criteria and references for use in the design, manufacture, installation, operation, maintenance, auditing and major modification of aerial adventure courses.
4.3 Unless this practice expressly provides otherwise in a particular provision, the term “Aerial Adventure Course” is to be used in place of “Amusement Rides and Devices” herein.
Scope
1.1 This practice establishes criteria for the Design, Manufacture, Installation, Operation, Maintenance, Auditing and Major Modification of Aerial Adventure Courses manufactured after the effective date of publication of this document except as noted in 1.3.
1.2 This practice applies to the following devices when operated for concession or commercial recreation.
1.2.1 Zip Lines.
1.2.2 Ropes Courses.
1.2.3 Challenge Courses.
1.2.4 Aerial Trekking Courses.
1.2.5 Canopy Tours.
1.3 This practice shall not apply to the following:
1.3.1 Aerial Adventure Courses when operated exclusively under the following applications:
1.3.1.1 Educational curriculum.
1.3.1.2 Physical fitness purposes.
1.3.1.3 Organized competitive events.
1.3.1.4 Therapeutic programs.
1.3.1.5 Training purposes.
1.3.1.6 Team and confidence building.
1.3.1.7 Playground equipment covered by Consumer Safety Performance Specification F1487.
1.3.2 Amusement rides and devices whose design criteria are specifically addressed in another ASTM standard.
1.3.3 Portions of an Aerial Adventure Course unaffected by a major modification.
1.3.4 Upgrades to electrical wiring, electrical motors and electrical components of Aerial Adventure Courses provided the original design and safety criteria are maintained or enhanced.
1.3.5 Pre-existing designs for Aerial Adventure Courses that are installed after the publication date of this practice if the design is service proven or previously compliant as specified by 1.3.5.1.
1.3.5.1 Aerial Adventure Course designs may qualify as “previously compliant” for five years following the date of publication of this practice. Thereafter, an Aerial Adventure Course design must qualify as “service proven” as defined in Practice F2291 or meet the requirements of this practice.
1.4 This practice includes an annex (mandatory), which provides additional information (for example, rationale, background, interpretations, drawings, commentary, and so forth) to improve the user’s understanding and application of the criteria presented in this practice. The annex information shall be interpreted as mandatory design criteria.
1.5 This practice includes an appendix (non-mandatory), which provides additional information (for example, rationale, background, interpretations, drawings, commentary, and so forth.) to improve the user’s understanding and application of the criteria presented in this practice. The appendix information shall not be interpreted as mandatory design criteria.
1.6 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Some specific hazards statements are given in Section 7 on Hazards.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.