Standard Guide for Safety, Access Rights, Construction, Liability, and Risk Management for Optical Fiber Networks in Existing Sewers
Standard Guide for Safety, Access Rights, Construction, Liability, and Risk Management for Optical Fiber Networks in Existing SewersF2233-03R21ASTM|F2233-03R21|en-USStandard Guide for Safety, Access Rights, Construction, Liability, and Risk Management for Optical Fiber Networks in Existing SewersStandardF2233 Standard Guide for Safety, Access Rights, Construction, Liability, and Risk Management for Optical Fiber Networks in Existing Sewers>newBOS Vol. 04.12 Committee F36
$64.00
In stock
Significance and Use
4.1 Safety factors must be addressed and incorporated into the work to protect the workers and the public, and construction activities may need to be altered accordingly. Engineering and construction costs are a part of the analysis.
4.2 Access rights to the work should be considered in the design of the project.
4.3 A construction professional, who has field experience in construction activities similar to the scope of work anticipated, should review the plans for constructability prior to starting the project.
4.4 Proper insurance and surety bonding to protect the interests of all parties to the agreement or contract should be considered.
4.5 Risk management assessment will identify the parties that are in the best position to control and be responsible for the different risks.
Scope
1.1 This guide addresses only primary safety concerns, easements, constructability, liability of the various parties, and risk management related to constructing, installing, maintaining, or changing an optical fiber network in an existing sewer.
1.2 The text of this standard references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.
1.3This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory requirements prior to use. See 4.1 and 5.1 – 5.1.7 for specific safety information.
1.4This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.