Standard Guide for Selecting Economic Methods for Evaluating Investments in Buildings and Building Systems
Standard Guide for Selecting Economic Methods for Evaluating Investments in Buildings and Building SystemsE1185-07E01ASTM|E1185-07E01|en-USStandard Guide for Selecting Economic Methods for Evaluating Investments in Buildings and Building SystemsStandardE1185 Standard Guide for Selecting Economic Methods for Evaluating Investments in Buildings and Building Systems>newBOS Vol. 04.11 Committee E06
$86.00
In stock
Significance and Use
Standard practices for measuring the economic performance of investments in buildings and building systems have been published by ASTM. A computer program that produces economic measures consistent with these practices is available. Discount Factor Tables has been published by ASTM to facilitate computing measures of performance for most of the practices.
This guide can be used to: (1) identify types of building design and system decisions that require economic analysis; (2) match the technically appropriate economic methods with the decisions; and (3) locate the methods in the ASTM practices and adjuncts listed in Section 2.
More than one method can be technically appropriate for many building decisions. Therefore the choice in practice of which technically appropriate economic method to use for evaluating a particular building decision will often depend on the perspective of the user. Some examples of factors that influence the user are: (1) ease of applying the methods, (2) level of familiarity of the user with the methods, (3) preference of the user for different methods, and (4) presence of budget limitations for the projects.
This guide identifies some features and limitations of the methods that might influence users' choices under varying conditions.
Scope
1.1 This guide identifies types of building design and building system decisions that require economic analysis and recommends ASTM practices, adjuncts, and computer programs that may be used to implement the appropriate economic methods for each decision type.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.