Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings
Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and FittingsC0564-08ASTM|C0564-08|en-USStandard Specification for Rubber Gaskets for Cast Iron Soil Pipe and FittingsStandardC564 Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings>newBOS Vol. 01.02 Committee A04
$77.00
In stock
Abstract
This specification covers preformed rubber gaskets used to seal joints in cast iron soil pipe and fittings. Gaskets shall be made of a properly vulcanized virgin rubber as the sole elastomer with no scrap or reclaim. Gaskets shall conform to the required physical properties such as hardness, elongation, tensile strength, tear strength and compression. The gasket material shall be tested for effects of heat aging. They shall be tested for weight increase due to water absorption and shall also be tested for volume decrease due to oil absorption. Gasket material shall be tested for ozone resistance.
Scope
1.1 This specification covers preformed rubber gaskets used to seal joints in cast iron soil pipe and fittings.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 The following safety hazards caveat pertains only to the test methods section of this specification: This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
1.4 The committee with jurisdiction over this standard is not aware of another comparable standard for materials covered in this standard.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.