Work Item
ASTM WK98125
Revision of F3665-25 Standard Practice for Classification, Design, Manufacture, Construction, Maintenance, and Operation of Controlled Surf Basins
Rationale
In comments on another ballot, ask was to look at adding E-stop refence to section 8.7 emergency action plan section.
Work Item Status
Date Initiated: 02-16-2026
Technical Contact: Thomas Lochtefeld
Item: 000
Ballot:
Status: