The store will not work correctly when cookies are disabled.
Due to scheduled maintenance, select standards and products will be unavailable for purchase beginning Thursday, December 4, 2025, at 12:00 a.m. Eastern (GMT-5) ending Friday, December 12, 2025 at approximately 12:00 p.m. Eastern (GMT-5).
Using Artificial Intelligence (AI) on ASTM standards and related intellectual property is prohibited. Violations will result in suspension of access.
Welded Ferritic Steel Construction for Intermediate Low-Temperature Service
Although ferritic steels can exhibit cleavage fractures at reduced temperatures, experience suggests that certain types may be used with safety at temperatures down to about −150 F provided that appropriate precautions are taken in design and fabrication. While common mild steels have been in use in ammonia refrigeration plants for upwards of a century, the employment of welded joints in modern construction, as compared with the earlier use of fully machined components with screwed and bolted joints, requires a qualification such as this. Early refrigeration engineers were familiar with cast iron, which is always brittle to a degree, and either disregarded or did not know of the existence of transition temperatures; their attitude was justified by the results achieved. It is perhaps curious that the present-day concern with transition temperatures owes more to failures outside the refrigeration industry. Nevertheless, transition temperatures are usefully, if indirectly, related to lowest safe temperatures for service. In the determination of transition temperature it is first necessary to consider quality control tests, such as the Charpy test with either the V or the U notch, whose primary purpose is to ensure uniformity of day-to-day steel production. The degree of success that has been additionally achieved with such tests in correlating a measured value of energy absorption, ductility, or appearance of fracture with the temperatures of brittle fracture casualties—notably ships—is tempered when the range of steels involved is diversified. Thus the 15 ft-lb energy absorption that arose as a criterion for transition temperature for war-built ships has had to be raised by international agreement with the inclusion of varied steels of postwar ship construction, mainly because the latter are equally brittle as far as the structure is concerned at higher energy absorptions, albeit at lower temperatures.
Author Information
Wells, A., A.
British Welding Research Assn., Cambridge, England
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.