Sufficient mechanical ductility of high-burnup Zircaloy-4 fuel cladding is important to prevent large-opening ruptures and significant fuel dispersal during postulated in-reactor and spent-fuel processing accidents. The effect of irradiation, oxidation, and hydriding at high fuel burnup may degrade cladding ductility to the extent that such large ruptures are possible under severe loadings. To understand this susceptibility to failure, this study focused on mechanical testing coupled with detailed finite-element modeling and analyses. Under ring-compression-type loading at room temperature, tensile cracks form within the corrosion-induced oxide layer under elastic loading. The oxide crack then propagates into the cladding wall under additional loading with little to no measurable plastic strain, as confirmed by both experiment and analyses of plastic hoop strain in the ring. For cladding with the oxide removed prior to testing at ≤1 %/s, cracking of the underlying hydride rim comprised of circumferentially oriented hydrides occurs at low plastic hoop strain (≤3 %), whereas the finite-element analysis suggests that the base alloy with a relatively small amount of hydrides appears to fail at higher strain (>8 %). At even higher strain rates (≈400 %/s), cracking within the hydride rim occurs at near-zero ductility, but the base alloy continues to remain highly ductile. These room-temperature results indicate that the hydride rim is sensitive to strain rate, whereas the base alloy is relatively not. With the precipitation of ≈100 % radially oriented hydrides, the cladding exhibits near-zero ductility at room temperature and ≈0.1 %/s. This study suggests that the ring-compression test coupled with finite-element modeling and analysis may be used to estimate crack-initiation strains in irradiated cladding materials with susceptible microstructures and under various deformation rates.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.