The store will not work correctly when cookies are disabled.
Due to scheduled maintenance, select standards and products will be unavailable for purchase beginning Thursday, December 4, 2025, at 12:00 a.m. Eastern (GMT-5) ending Friday, December 12, 2025 at approximately 12:00 p.m. Eastern (GMT-5).
Using Artificial Intelligence (AI) on ASTM standards and related intellectual property is prohibited. Violations will result in suspension of access.
Early tooling results in laitance at tooled surfaces. The laitance consists of smooth, soft, and optically continuous high water-cementitious materials ratio (w/cm) paste that contains fines that bled to the surface from the cementitious materials and aggregate. The cement is extensively hydrated. Late tooling results in discontinuous, fine, chatter-marked surfaces. These discontinuities create surface shadows. Portland cement hydration is very poor due to a low w/cm. Normal tooling results in surface textures between those from early and late tooling along with cement hydration close to that associated with late tooling. In normal- and late-tooled joints, the portland cement evidences restricted hydration due to water “squeezed” from the relatively stiff surfaces, which creates a low w/cm. Significant color differences from light to dark result when joints are, respectively, struck and tooled early, normal, and late. Overall lower w/cm results because masonry units absorb some of the mix water. Wetted bricks extend curing. Affecting the time of mortar stiffening, which controls the time of tooling, is loss of water from joint surfaces and water absorbed by masonry units. The rate of water loss from joint surfaces is a function of the water retention properties of the mortar and ambient atmospheric conditions. Pigment properties of the mortar-making materials, and particularly the portland cement, plus surface textures, establish the color and color tone of joints. A primary contributor to darker surfaces is the degree of cement hydration: the poorer the hydration, the darker the color and color tone. Affecting the degree of cement hydration is the w/cm and the curing period: higher w/cm and longer curing increases hydration and lightens color. A secondary contributor to color tone is surface texture: the greater the number of surface discontinuities the darker the color tone. Cementitious materials components that generally contribute to lighter color tones include hydrated lime and the inert material in masonry cements.
Author Information
Erlin, Bernard
The Erlin Company, Materials and Construction Consultants, Latrobe, PA
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.