Examination of the asphalts used in the Zaca-Wigmore project by means of the microfilm durability test gave ratings of the relative durability to be expected of the asphalts when all are used under the same conditions. The actual order of occurrence of failures in the test road to date is in agreement with the predictions of this relatively simple and rapid laboratory test.
Viscosity measurements show that hardening during the asphalt-aggregate mixing operation was about twice as great during period 1 of this construction as during period 2 and this difference in hardening in the mix plant is still evident after several years in the road.
Progressive hardening of the asphalts in the road over a period of several years was found to parallel that found in the microfilm durability test in a few hours. In the first test road (period 1) construction, where pavement deflections are about 0.015 to 0.025 in. under a 15,000-lb axle load, failures developed when the asphalt viscosity at 77 F entered the range 107 to 108 poises. In the other test road (period 2) construction where deflections are about 0.010 in. under the same load, the first distress was noted in an asphalt which reached a viscosity at 77 F of about 108 poises.
Recovery of asphalt from slices of pavement cores showed that hardening of the asphalt is greatest at the top and decreases with increasing depth in the pavement. Pavements with high air void content were found to harden more rapidly than those with low air voids.
Hardening by loss of volatile matter is an important fraction of the total hardening observed in these asphalts. It is shown that this can be controlled by proper selection of crude oil or by application of distillation and blending techniques so as to keep the 10 per cent distilled point of the asphalt at or above 400 C (converted to atmospheric pressure).
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.