For the Residential Conservation Service Program (RCS), the Department of Energy (DOE) in 1979 promulgated standard practices for the installation of various energy conservation retrofit measures, including insulation. Various standard provisions and recommendations exist for moisture control in insulated walls of new constructions. These provisions in general require a vapor retarder on the warm side of walls and ceilings in all but the warmest climate areas. To apply these existing requirements to retrofit applications of insulation would be burdensome and costly. Since field experiences did not indicate conclusively that moisture problems in insulated walls can be prevented by the application of vapor retarders, nor that the absence of vapor retarders necessarily leads to moisture damage in insulated walls, DOE, with the assistance of the National Bureau of Standards (NBS) and outside consultants, developed new standard provisions specifically designed for retrofit wall installations. For roofs, the vapor retarder and attic ventilation requirements contained in the Housing and Urban Development (HUD) Minimum Property Standards (MPS) and the American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) Guidelines were adopted unchanged. This paper thus deals with exterior wall retrofit.
The provisions were developed based on the premise that the relative humidity of the interior air is a good indicator of the potential for moisture condensation in walls. The RCS provisions stipulate a vapor retarder only in high-moisture rooms of houses in ASHRAE condensation Zone 1, but such rooms also require the sealing of cracks on the interior face of exterior walls to prevent moist indoor air from penetrating into the wall cavity. In addition, the standards recommend the same provisions in Zone 2. Finally, the provisions identify houses by size, occupancy rate, and other parameters for which additional precautions may be justified.
Author Information
Trechsel, HR
H. R. Trechsel Associates, Building Construction Consultants, Germantown, Md.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.