The main objective of this paper is to describe the effects of a long service exposure of the PWR fuel cladding tubes on their thermal-mechanical properties during and after a hypothetical LOCA transient. Within this prospect, specific studies have been performed: on one hand, thermal ramp tests under uniaxial stress loading on as-received, pre-hydrided and irradiated samples of Zy-4 and M5™, and on the other hand, mechanical tests after high temperature oxidation and quench on as-received and pre- hydrided Zy-4 and M5™. The main conclusions are: (1) In service, hydrogen pick-up impacts the thermal ramp behavior under uniaxial stress loading of cladding tubes upon the first phase of LOCA transient, and the effect of the irradiation defects can be ignored for the conditions tested. (2) As-received Zy-4 and M5™ achieve comparable post-quench mechanical behavior at 1000, 1100, and 1200°C for representative times of LOCA transient (1800 s). (3) Oxygen has the most important effect in embrittlement of as-received Zr alloys at 1100 and 1200°C. (4) Hydriding has no effect on the oxidation kinetics at 1200°C, but after quenching the hydrided materials become brittle at a lower weight gain than as-received materials; this embrittlement is due both to an intrinsic hydrogen-embrittlement effect and to the oxygen content increase resulting from the effect of hydrogen on its solubility in prior-Beta phase.
Author Information
Portier, L
CEA/DEN, Service de Recherches Métallurgiques Appliquées, CEA/Saclay, Gif-Sur-Yvette, France
Bredel, T
CEA/DEN, Service d'Etudes des Matériaux Irradiés, CEA/Saclay, Gif-Sur-Yvette, France
Brachet, J-C
CEA/DEN, Service de Recherches Métallurgiques Appliquées, CEA/Saclay, Gif-Sur-Yvette, France
Maillot, V
CEA/DEN, Service de Recherches Métallurgiques Appliquées, CEA/Saclay, Gif-Sur-Yvette, France
Mardon, J-P
Framatome-ANP Nuclear Fuel, Lyon, France
Lesbros, A
Electricité de France, Service Etudes et Projets Thermiques et Nucléaires, Villeurbanne, France
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.