Chemical interactions between the UO2 fuel and the Zircaloy-4 cladding material under power cooling mismatch (PCM) conditions are described. The out-of-pile uranium oxide (U02)/Zircaloy-4 reaction experiments were performed with short Zircaloy-4 tubular specimens filled with U02 pellets at temperatures between 900 and 1500°C under variable U02/Zircaloy-4 contact pressures and under inert gas conditions. The annealing periods varied between 3 and 60 min.
Due to the thermodynamic instability between U02 and Zircaloy, U02 is partially reduced by Zircaloy at the high temperatures investigated. The extent of the UO2/Zircaloy reaction as well as the composition of phases depends decisively on whether a good solid contact between U02 and Zircaloy has been established. If a solid contact exists, a (U-Zr)-alloy rich in uranium and an oxygen stabilized α-Zr(O) phase are formed.
The degree of chemical interaction between U02 and Zircaloy is determined by oxygen diffusion in the Zircaloy and the α-Zr(O)-phase formed. The UO2-Zircaloy reactions obey a parabolic rate law whose temperature dependence is given in the corresponding Arrhenius plot. The formation of oxygen-stabilized °-Zr(O) implies heavy embrittlement of the Zircaloy cladding above 1200°C. Thin oxide layers on the cladding tube inner surface prevent UO2/Zircaloy reactions from taking place below 1100°C. Simulated fission products (cesium, iodine, tellurium) in UO2 exert practically no influence on the extent of the reaction.
A comparison of the out-of-pile test results with those of in-pile experiments exhibits a very good agreement with respect to the phases formed.
Author Information
Hofmann, P
Institut für Material- and Festkorperforschung, Projekt Nukleare Sicherheit, Kernforschungszentrum Karlsruhe, Karlsruhe, Federal Republic of Germany
Politis, C
Institut für Material- and Festkorperforschung, Projekt Nukleare Sicherheit, Kernforschungszentrum Karlsruhe, Karlsruhe, Federal Republic of Germany
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.