An earlier paper (Trowse et al, ASTM STP 633) described the nodular corrosion of Zircaloy and other zirconium alloys in a steam generating heavy water reactor (SGHWR) and related environments. The observations have now been extended to more highly irradiated elements up to the design burn-up of 20 MWD/kgU mean. Maximum observed local oxide thicknesses were less than the earlier predictions of 200 μm for SGHWR cladding at the design burn-up and are acceptable from fuel performance considerations.
Most of the data presented relates to Zircaloy-2 in the stress-relieved condition, but results from elements with recrystallized cladding show that oxidation resistance can be improved by this treatment. In particular, the oxide nodules are much finer in the recrystallized alloy, leading to a generally smaller coverage of nodular oxide.
The maximum depth of oxidation is correlated to fast neutron dose and is apparently little affected by coolant mass flow-rate or steam quality.
Previous work had shown evidence for oxidation enhancement of Zircaloy at support grid positions by galvanic coupling to stainless steel and also by localized coolant flow disturbance. In order to determine the relative importance of these two factors, an experimental element fitted with alternate stainless steel and Zircaloy grids of similar geometry was irradiated in SGHWR. The results confirmed that most of the oxidation enhancement is due to the galvanic coupling but that significant flow effects at grids were also present in the higher flow, higher steam quality region of the element down-stream of the peak flux position.
Author Information
Sumerling, R
United Kingdom Atomic Energy Authority, Windscale Nuclear Laboratories, Sellafield, Seascale, Cumbria, England
Garlick, A
United Kingdom Atomic Energy Authority, Windscale Nuclear Laboratories, Sellafield, Seascale, Cumbria, England
Stuttard, A
United Kingdom Atomic Energy Authority, Windscale Nuclear Laboratories, Sellafield, Seascale, Cumbria, England
Hartog, JM
United Kingdom Atomic Energy Authority, Springfields Nuclear Laboratories, Salwick, Preston, England
Trowse, FW
United Kingdom Atomic Energy Authority, Springfields Nuclear Laboratories, Salwick, Preston, England
Sims, P
Technology Branch, United Kingdom Atomic Energy Authority, Atomic Energy Establishment, Winfrith, Wool, Dorset, England
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.