In general, PWR reactor vessels are made of low alloy nickel manganese molybdenum steel. The behavior of this material under neutron irradiation is now relatively well known. On the other hand, the weld metals used for these vessels, which are also irradiated, exhibit a wide range of metallurgical structures and trace element contents, and further studies are necessary to gain a better understanding of their behavior under irradiation. Fourteen weld deposits were irradiated with a fluence of 5×1019 n/cm2 (E > 1 MeV) at 288°C. The results of the corresponding Charpy V-notch impact tests are presented. Emphasis is given to the roles of copper and nickel. The effects of the different welding processes (shielded metal arc and submerged are welding) are also studied. The consumable products used were either of commercial origin or made specially in order to obtain copper contents between 0.02 and 0.18 % and nickel contents between 0.07 and 1.85 %. The results indicate that nickel strongly enhances irradiation damage in the same way as copper, but the effects of the nickel contents seem to be very dependent on the copper contents. The roles of these two elements (and also that of phosphorus) in the brittle-ductile transition temperature shift is quantitatively expressed in a formula which takes the irradiation damage of these 14 welds into account, together with that of 16 further base metal samples irradiated under Lidentical conditions in the same laboratory. Meanwhile irradiation damage did not appear to be related to the particular welding process used.
Author Information
Guionnet, C
Commissariat à l'Energie Atomique, Gif sur Yvette, France
Houssin, B
Materials Depart., Framatome & Cie, Paris la Défense, France
Brasseur, D
Materials Depart., Framatome & Cie, Paris la Défense, France
Lefort, A
Commissariat à l'Energie Atomique, Gif sur Yvette, France
Gros, D
Commissariat à l'Energie Atomique, Gif sur Yvette, France
Perdreau, R
Commissariat à l'Energie Atomique, Gif sur Yvette, France
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.