A typical steam generator in a nuclear power station consists of about 4000 tubes which form the boundary separating the light water in the secondary circuit from the primary circuit water. The integrity and the life expectancy of these tubes are therefore of prime concern to the designers.
One of the several tube failure mechanisms, which include corrosion and fatigue, is fretting wear due to flow-induced tube vibrations. The tube-tube support clearance needed for design considerations allows periodic separation and impacting between the tube and the tube support hole and hence ready removal of loose wear particles by the fluid flow. It has been found that the combined rubbing and impacting motion, together with the periodic separation of contacting surfaces, all contribute to an accelerated wear process.
A tube-fretting test apparatus has been developed to study the effect on tube wear of various parameters, such as tube-tube support interaction, materials, temperature, and clearance. Tests have been conducted in water at room temperature and at steam-generator operating temperature (265°C). Recently the authors have looked into the more fundamental aspect of tube fretting wear mechanisms. Some of the worn surfaces were further studied by a surface analyzer interfaced with a computer and by a scanning electron microscope. The results from these analyses were correlated to other tube fretting parameters, namely, tube motion, clearance, and impact forces at the support. We have found that the effects of these parameters on wear are interrelated. The understanding of these interrelated effects is of great importance in predicting long-term tube wear. This paper will describe our fretting test facilities and present the results from recent studies on wear correlations.
Author Information
Ko, PL
Atomic Energy of Canada Limited, Chalk River Nuclear Laboratories, Chalk River, Ontario, Canada
Tromp, JH
Atomic Energy of Canada Limited, Chalk River Nuclear Laboratories, Chalk River, Ontario, Canada
Weckwerth, MK
Atomic Energy of Canada Limited, Chalk River Nuclear Laboratories, Chalk River, Ontario, Canada
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.