Zircaloy-2 fuel tubing with different compositions has been manufactured by a variety of thermomechanical processes to evaluate manufacturing variables that could influence nodular corrosion. The primary variables studied include: (1) alloy composition. (2) thermal annealing history, (3) tube texture, and (4) recrystallized versus stress relieved tubing. A total of 48 tubing variants were fabricated and tested.
Results from 793 K steam autoclave tests revealed that all variables examined influence the corrosion behavior with complex interactions between the variables. Alloy composition and thermal history exhibited the strongest influence. Improved corrosion resistance was observed for the material containing a lower Sn concentration and annealed at lower temperatures. The effect of thermal history was not consistent with the accumulated annealing parameter formulation. A single 1005 K anneal late in the manufacturing process produced extremely high weight gains compared to lower values when the same anneal occurred early in the process or when annealing for longer times at lower temperatures to obtain the same accumulated annealing parameter. Small improvements in corrosion resistance for the more sensitive materials were obtained from tubing produced with a more radial texture. Stress relieved tubing was generally less sensitive to nodular corrosion than comparable recrystallized tubing.
Microstructural examinations did not identify the cause for the observed variations in corrosion behavior. Particle size distributions were independent of the material or processing histories. This lack of any correlation indicates that the particles themselves do not control the corrosion behavior, but a specific microstructural feature was not found that would explain the corrosion behavior.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.