In surveillance programs for some older nuclear power plants, the orientation of specimens is longitudinal to the main working direction. According to presently valid codes and standards, the specimen orientation should be transverse. The material toughness is lower in the transverse direction. However, according to former test results, there was common acceptance that the shift as a result of irradiation is independent of orientation. The results of more recent research on trepan material taken from a decommissioned power plant seemed to give reason for doubt in this respect.
Siemens/KWU has simultaneously irradiated Charpy-V specimens made of steel 22 NiMoCr 3 7 (similar to ASTM A 508 cl. 2) with both orientations. Furthermore, transverse specimens were made out of the broken specimen halves from irradiation experiments with only longitudinal specimens using electron beam welding techniques.
The available results of this research and an ample number of relevant data from literature were evaluated. From this it is concluded that independent of a wide variation of parameters the 41-J transition temperature of transverse specimens is on average about 11°C higher than that of longitudinal specimens and the irradiation-induced shift ΔT41 is independent of specimen orientation. The upper shelf energy (USE) shows a wider scatter. As a lower bound, the proposal of the U.S. Nuclear Regulatory Commission (NRC) standard review plan to substitute 65% of longitudinal USE for unavailable transverse values is confirmed by 90% of all data for unirradiated and irradiated material. The deviations, especially of the Gundremmingen trepan results, obviously depend on fabrication inhomogeneity rather than on irradiation effects.
Author Information
Leitz, C
Siemens AG, Power Generation Group KWU, Erlangen, Germany
Klausnitzer, EN
Siemens AG, Power Generation Group KWU, Erlangen, Germany
Hofmann, G
Siemens AG, Power Generation Group KWU, Erlangen, Germany
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.