The U.S. Department of the Army (DA) is responsible for the treatment and disposal of heavy metal wastes generated at DA facilities. Heavy metal wastewaters are gen erally treated by hydroxide precipitation. An alternative technique uses xanthates to precipitate the heavy metals. Both of these processes produce a sludge defined as hazardous by the Resource Conservation and Recovery Act (RCRA). One method proposed for treating such materials is solidification/stabilization (S/S). S/S renders a waste less toxic by chemically immobilizing the hazardous constitutes in a solid matrix.
This study evaluated the ability of cellulose and starch xanthate to immobilize heavy metals and compares the results with the metal immobilization capability of hydroxide precipitation. Solidified and unsolidified sludges resulting from starch xanthate, cellulose xanthate, and hydroxide precipitation processes were tested for their physical and chemical characteristics. Sludges were prepared using either cellulose xanthate, starch xanthate, or calcium hydroxide to treat a synthetic waste solution containing four heavy metals (cadmium, chromium, nickel, and mercury) in a laboratory-scale study. Sludges were solidified with portland Type I cement. Physical tests performed on the solidified and unsolidified xanthate and hydroxide sludges included unconfined compressive strength and the cone penetration tests. Chemical leaching characteristics of the unsolidified sludges were determined using the U.S. Environmental Protection Agency's extraction procedure test and a serial graded batch extraction procedure. Results from this study indicated that the solidified materials reduced the concentration of metals in the leachate when compared to the unsolidified sludges. The solidified sludges also developed unconfined compressive strengths as high as 2000 kPa.
Author Information
Bricka, RM
U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS
Hill, DO
Mississippi State University, Mississippi State, MS
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.