SYMPOSIA PAPER
Published:
01 January 1992
STP19730S
Concrete Slurry Wall for Temporary and Permanent Foundation Wall at Gallery at Harborplace — Baltimore, Maryland
SourceThe selection and installation of a concrete diaphragm wall by the slurry trench process simplified construction and provided high quality underground space for a 5-level garage in Baltimore, Maryland. The tieback supported wall retained the adjacent streets and utilities with surface settlement ranging from 0.5 to 0.75 in. (12.7 to 19.1 mm). Groundwater levels were maintained and seepage into the excavation was reduced to about 5 gallons per minute (0.32 L/s). Geotechnical instrumentation data confirmed satisfactory performance of the wall and tieback system; instrumentation was also key during assessment and resolution of construction problems which led to additional lateral displacement of the wall.
Author Information
Gifford, DG
Haley & Aldrich, Inc., Cambridge, MA
Wheeler, JR
Haley & Aldrich, Inc., Cambridge, MA
Related
Reprints and Permissions
Details
Developed by Committee: D18
Pages: 151–163
DOI: 10.1520/STP19730S
ISBN-EB: 978-0-8031-5191-8
ISBN-13: 978-0-8031-1427-2