The increased discharge burnups envisaged today require an optimization of the Zircaloy cladding properties with regard to corrosion with different strategies for optimizing the corrosion for boiling water reactor (BWR) and pressure water reactor (PWR) applications.
A broad laboratory study showed that the influence of temperature and environmental details upon autoclave test results is rather complex. Zircaloy with fine (∼ 0.05 μm), uniformly distributed intermetallic precipitates reveals nodular corrosion in steam at 420°C or below and excessive uniform corrosion in water at 350°C, but the best nodular behavior in steam at 500#x00B0;C. However, samples with larger intermetallic precipitates (>0.2 μm) exhibit a strong tendency to nodular corrosion in 500°C steam, but good behavior in steam at 420°C or below and in water at 350°C. The tendency toward nodular corrosion in 400 to 500°C steam can be suppressed by additions of oxygen; the ranking in uniform corrosion in 350°C water can be altered by additions of hydrogen. The latter was observed on samples exposed up to 1000 days in degassed water and afterwards 1000 days in water with a hydrogen overpressure.
Similar correlations were found for in-pile exposure with some exceptions. Materials with very fine intermetallic precipitates, which show little tendency for nodular corrosion and behave well in-pile in oxygenated (mostly BWR) environments, exhibit accelerated uniform corrosion in a hydrogenated (PWR) environment with a corrosion rate that depends very little on temperature. However, in oxygenated coolant, materials with coarse precipitates indicate severe nodular corrosion, which is almost independent of the temperatures within the range of 290 and 350°C. As a result of these findings a dual strategy is technologically feasible by using different values of the accumulated annealing parameters (Σ Ai) for BWR and PWR application. For optimized BWR cladding tubes ΣAi ⩽ 10 -18 h is proposed; the best range for PWR cladding appears to be at 2 × 10-18 h ⩽ Σ Ai ⩽ 5 × 10-17 h.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.