Since the first International Energy Conservation Code (IECC) edition was published in 1998, each update has brought more stringent requirements aimed at reducing the energy consumption of the built environment in response to climate change. Changes related to building envelopes have focused on eliminating air leakage, increasing thermal performance, and emphasizing fenestration performance. These changes fundamentally alter the design and operation of building envelopes. This paper highlights the changes over the past 25 years driven directly and indirectly by IECC and discusses how hygrothermal loading and building performance have evolved. Occasionally, IECC requirements were implemented shortsightedly and subsequent revisions to the IECC attempted to correct for detrimental assemblies. Specifically, this paper examines the following themes from a hygrothermal performance perspective: (1) It describes how code changes have swayed industry insulation choices—including the market shift toward rock wool and away from extruded polystyrene within exterior wall cavities due to new NFPA 285 requirements—and examines how these changes have affected the hygrothermal performance of wall assemblies. (2) It discusses how continuous air barriers have reduced the convective drying potential of envelope assemblies and the detrimental impact occurring if when limited air movement is not properly accounted for when selecting the thermal and vapor resistance of all the materials within the assembly. (3) It outlines the hygrothermal benefit of continuous insulation beyond the air/water barrier and how IECC has evolved to specifically balance the thermal gradient. (4) It reviews the history of vapor retarder requirements in the International Building Code (IBC) and their impact on insulation placement, insulation type, and facer material. (5) Finally, it describes the move to unvented roof systems (recently permitted by IBC), the increasing use of spray polyurethane foam at the underside of the roof deck, and the unintended hygrothermal risks of such assemblies.
Author Information
Wagner, Carly, M.
WDP & Associates Consulting Engineers, Inc., Charlottesville, VA, US
Scolforo, Shannon, L.
WDP & Associates Consulting Engineers, Inc., Charlottesville, VA, US
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$19.47
$50.01 to $100.00
$21.63
$100.01 to $150.00
$30.70
$150.01 to $250.00
$40.66
$250.01 to $500.00
$58.50
$500.01 to $750.00
$79.48
$750.01 to $1000.00
$96.88
$1000.01 to $1500.00
$126.13
$1500.01 to $2500.00
$164.72
$2500.01 to $4999.00
$217.40
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$69.47
$50.01 to $100.00
$71.63
$100.01 to $150.00
$80.70
$150.01 to $250.00
$90.66
$250.01 to $500.00
$108.50
$500.01 to $750.00
$129.48
$750.01 to $1000.00
$146.88
$1000.01 to $1500.00
$176.13
$1500.01 to $2500.00
$214.72
$2500.01 to $4999.00
$267.40
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.