The present study reports on the identification of an adequate process window for electron beam powder bed fusion (E-PBF) of AISI 4140 steel. For characterization, only miniature samples were used. It is clearly revealed that, for comparison and evaluation of different conditions, the use of such small samples is absolutely sufficient, even under fatigue loading. The initial E-PBF as-built condition is compared with conventionally heat-treated conditions (i.e., normalized as well as quenched and tempered). Based on the results obtained, the advantages of E-PBF in comparison to other additive manufacturing routes, such as laser powder bed fusion (L-PBF), are discussed. In E-PBF, a very ductile material behavior results from the prevailing process conditions. Furthermore, an as-built condition almost free of residual stresses is established by E-PBF. Microstructural as well as fracture surface analyses were conducted and further supported by three-dimensional defect characterization applying X-ray computed tomography. It was found that the microstructural appearance of the as-built condition is affected most severely by the relatively sluggish cooling after the uppermost layer is finished. Thus, many issues related to L-PBF processing of carbon steels such as AISI 4140 do not prevail in E-PBF. The results obtained by mechanical testing clearly reveal that the remaining process-related volume defects can be compensated to a certain extent in the ductile as-built state. Consequently, the non-heat-treated, as-built condition is characterized by fatigue properties similar to those of post-treated AISI 4140. The latter, however, is characterized by superior strength under monotonic loading.
Author Information
Fischer, Andreas
University of Kassel, Institute of Materials Engineering—Metallic Materials, Kassel, DE
Vollmer, Malte
University of Kassel, Institute of Materials Engineering—Metallic Materials, Kassel, DE
Krooß, Philipp
University of Kassel, Institute of Materials Engineering—Metallic Materials, Kassel, DE
Niendorf, Thomas
University of Kassel, Institute of Materials Engineering—Metallic Materials, Kassel, DE
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.