Continuity of the air and water-resistant barrier (AWB) is critically important in high-performing buildings. Achieving continuity of these barriers at interfaces of different material systems is often a challenge. It becomes more challenging when the different barriers are installed in a nontraditional order within the building envelope or when penetrations are added after the AWB has been installed. This paper looks at the design and installation of tested, durable transitions between the AWB and other systems, including considerations for the window interface when the AWB is installed outboard of the continuous insulation, when the insulation is installed behind the exterior sheathing and AWB, and when the continuous insulation is also the AWB in commercial construction. The paper also examines the effects of the AWB being in or out of plane with the windows and the effects of the sequencing of window installation, specifically what happens when the window is installed either before or after the AWB. Options to reduce the number of fastener penetrations to the AWB before cladding installation are also shown. All discussed interface details are based on results from advanced system testing using a sequence of multiple ASTM test methods for air and water penetration before and after structural and thermal conditioning. In addition to interfaces in place prior to the installation of the AWB, penetrations are often installed after the AWB. One of the most frequent penetrations is for cladding attachments such as girt systems and when continuous insulation is installed. This paper presents an overview of results from testing conducted to determine how best to attach girt systems to continuous insulation that is also performing as the AWB along with an introduction to new innovations that ensure long-term water tightness when installing continuous insulation over an AWB.
Author Information
Watts, Andrea, Wagner
DuPont Performance Building Solutions, East Aurora, NY, US
Ranson, William
DuPont Performance Building Solutions, Richmond, VA, US
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.