Accelerating irradiation growth has been reported for several zirconium alloys with a range of metallurgical states during high-temperature tests in fast-breeder reactors (673 to 723 K) for annealed Zircaloys in thermal test reactors at power reactor temperatures (523 to 623 K) and in power reactor core components fabricated from annealed or recrystallized Zircaloy. In the latter case, there was a transition from low to high irradiation growth rates at moderate fluences (about 3 × 1025 n/m2, E > 1 MeV, at 580 K) related to the nucleation and growth of basal plane c-component loops.
It was recently reported that the elongation rate of cold-worked Zircaloy-2 pressure tubes also accelerates with increased fluence at about 550 K. This gradual acceleration coincides with a gradual increase in the density of c-component dislocations as a result of the helical climb of those dislocation segments with a predominantly screw character.
New data showing the acceleration of growth of cold-worked Zircaloy-2 at 550 K are presented, and a model is presented for the irradiation growth behavior of cold-worked Zircaloy-2 based on the evolution of the sink strengths of c-component dislocations (net vacancy sinks) and a-type dislocations (net interstitial sinks) as a function of fast fluence. According to the model, the growth rate reaches a maximum when the sink strength of c-component dislocations is approximately equal to that of the a-type dislocations, and hence the growth rate tends to saturate with increasing fluence.
Author Information
Holt, RA
Atomic Energy of Canada Ltd., Chalk River Laboratories, Chalk River, Ontario, Canada
Causey, AR
Atomic Energy of Canada Ltd., Chalk River Laboratories, Chalk River, Ontario, Canada
Christodoulou, N
Atomic Energy of Canada Ltd., Chalk River Laboratories, Chalk River, Ontario, Canada
Griffiths, M
Atomic Energy of Canada Ltd., Chalk River Laboratories, Chalk River, Ontario, Canada
Ho, ETC
Ontario Hydro Technologies, Toronto, Canada
Woo, CH
Atomic Energy of Canada Ltd., Whiteshell Laboratories, Pinawa, Manitoba, Canada
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.