The store will not work correctly when cookies are disabled.
Due to scheduled maintenance, select standards and products will be unavailable for purchase beginning Thursday, December 4, 2025, at 12:00 a.m. Eastern (GMT-5) ending Friday, December 12, 2025 at approximately 12:00 p.m. Eastern (GMT-5).
Using Artificial Intelligence (AI) on ASTM standards and related intellectual property is prohibited. Violations will result in suspension of access.
The design of modern high-performance facades for the construction industry’s largest and most significant projects often involves the use of prefabrication, modern glazing, or curtain wall technologies (or combinations thereof). As a means of quality assurance and control, we depend on familiar tools: applicable codes and industry standards, specified performance requirements, Building Enclosure Commissioning, best practices, warranties, performance mock-ups, performance verification testing, and field inspection. Yet even systems designed with the highest level of detail and the most rigorous quality assurance/quality control programs may still be undermined by piecemeal value management, shortcomings in coordination, and cost and schedule issues. The forensics of building enclosure science is replete with cautionary tales of building enclosures that were designed with the highest of aspirations but that failed to perform as intended. Using an institutional building constructed in 2001 as a case study, we will take a deep dive into the critical details (transitions within the assembly as it evolves from roof to wall, joints, and water management systems) and other sometimes vague requirements such as serviceability and durability. The advantage of hindsight during an evaluation is that we are able to evaluate individual failures as well as the relationship and cascading effects that failures can have on other time-dependent durability requirements. We will present a taxonomy for understanding and analyzing each individual failure, the relationships such failures have with one another, and the decisions made during a project. These organizational strategies may be useful tools when making decisions during early project phases. While the ultimate service life of many “modern” curtain wall systems is expected to exceed the careers of practitioners tasked with design, manufacture, and installation of the systems, a critical look at these issues will become increasingly important as the building stock of high-performance facades and architectural glass continues to age.
Author Information
Keegan, Jennifer
GAF, 1 Campus Dr., Parsippany, NJ, US
Ridgway, Matthew
Intertek, Building Science Solutions, York, PA, US
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.