The lifetime of nonrestorable reactor equipment (e.g., reactor pressure vessels, in- and ex-vessel constructions, reactor support structures) of a first-generation water-water energetic reactor, VVER-440, may restrict plant life as a whole. Service life extension has affected the first generation of VVER-440 type reactors. Today, all Russian first-generation VVER-440s that have been in operation more than 45 years run with reduced cores by using dummy assemblies, except reactor Unit 4 of the Novovoronezh nuclear power plant. In comparison with other power units, the full-core loading scheme of this unit results in the highest neutron fluence accumulated over the whole operation period. Another important aspect of dosimetry research on Unit 4 of the Novovoronezh nuclear power plant reactor is the verification and validation of calculational methods used for the prediction of the maximum neutron fluence on the VVER-440 pressure vessel.
Author Information
Borodkin, Pavel
Scientific and Engineering Centre for Nuclear and Radiation Safety, Moscow, RU
Gazetdinov, Azamat
Scientific and Engineering Centre for Nuclear and Radiation Safety, Moscow, RU
Khrennikov, Nikolay
Scientific and Engineering Centre for Nuclear and Radiation Safety, Moscow, RU
Konheiser, Jörg
Helmholtz Zentrum Dresden-Rossendorf e.V. (HZDR), Dresden, DE
Dzhalandinov, Alexander
OKB “Gidropress,”, Podolsk, RU
Sidorov, Alexander
OKB “Gidropress,”, Podolsk, RU
Aleshin, Sergey
National Research Centre, Kurchatov Institute (NRC KI), Moscow, RU
Zaritskiy, Sergey, M.
National Research Centre, Kurchatov Institute (NRC KI), Moscow, RU
Egorov, Alexander, L.
National Research Centre, Kurchatov Institute (NRC KI), Moscow, RU
Kochkin, Vyacheslav, N.
National Research Centre, Kurchatov Institute (NRC KI), Moscow, RU
Erak, Dmitry, Yu.
National Research Centre, Kurchatov Institute (NRC KI), Moscow, RU
Panferov, Pavel
National Research Centre, Kurchatov Institute (NRC KI), Moscow, RU
Makhotin, Denis
National Research Centre, Kurchatov Institute (NRC KI), Moscow, RU
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.