Energy loss through building walls is estimated to cost the U.S. Department of Defense (DOD) about $200 million per year, accounting for 5 % of the total energy cost in DOD facilities. This article describes the demonstration of a high-performance insulation material, called modified atmosphere insulation (MAI), to reduce wall-related heat losses in a DOD building located in Ft. Drum, NY, in a cold climate. MAI has been demonstrated to achieve R32/in. (hr-ft2-°F/Btu-in) or greater and its use can significantly increase the thermal resistance of walls with a marginal increase in wall thickness, making it an ideal candidate for retrofit application. MAI is a variant of vacuum insulation panels produced at a substantially reduced cost resulting from a change in the evacuation process. By retrofitting walls and increasing thermal resistance, as measured by R-value, by R10-20 (h-ft2-°F/Btu), reductions of 30 % or more over baseline wall-generated space conditioning loads are possible. Further, with targeted applications for older or more poorly insulated facilities, greater energy savings can be achieved. In this article, the installation of MAI panels in an existing building at Ft. Drum and the resulting energy benefits will be described. Like vacuum insulation panels, MAI panels consist of an evacuated nanoporous core that is encapsulated within air- and vapor-impermeable barrier films. Addition of these impermeable barrier films can have implications on the moisture storage and movement within the wall systems. Therefore, in addition to the thermal performance evaluation, measurements and modeling will be used to determine the hygric behavior of the retrofitted walls.
Author Information
Biswas, Kaushik
Oak Ridge National Laboratory, Oak Ridge, TN, US
Desjarlais, Andre
Oak Ridge National Laboratory, Oak Ridge, TN, US
Jiang, Timothy
Vanderbilt University, Dept. of Mechanical Engineering, Nashville, TN, US
Patel, Tapan
U.S. Army Corp of Engineers, Engineer Research and Development Center, Construction Engineering Research Lab, Champaign, IL, US
Nelson, Andrew
U.S. Army Corp of Engineers, Engineer Research and Development Center, Construction Engineering Research Lab, Champaign, IL, US
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.