Maintaining the safe operation of nuclear power plants (NPPs) is crucial. This requires fully understanding long-term irradiation mechanisms and their effects on components such as the reactor pressure vessel (RPV). The research community is collecting data that will be required to support the case for the extended operation of western-type NPPs to beyond 60 years. One of the current issues regarding the long-term operation of RPVs is the formation of so-called late-blooming phases or MnNi-rich clusters (MNPs). The formation mechanisms of these features under irradiation, and their influence on material degradation at high neutron fluence (ϕt), are still unclear. The LONGLIFE project (Contract No. 249360), a EURATOM FP7 project supported by the European Commission, was designed to examine the effect of long-term irradiation on the embrittlement of RPV steels. In this paper, microstructural examinations of two low-copper welds, with different nickel contents, neutron irradiated up to about 5 × 1019n cm−2 (E > 1 MeV), are reported. Transmission electron microscopy and high-angle angular dark field scanning transmission electron microscopy (HAADF) investigations provide evidence of a very high number density of irradiation-induced nanometer-scale clusters. HAADF image data indicate that the features have a lower average projected atomic number or density than the matrix. These results are consistent with the atom probe tomography data, which demonstrate that these clusters contain high levels of manganese, nickel, and silicon. The cluster chemistries of these clusters that were detected from two different weld metals were almost identical and were similar to the chemistry of the MNPs. The cluster number density of the weld metal with more copper and nickel was found to be higher.
Author Information
Lim, J., J. H.
Dept. of Materials, Univ. of Oxford, Oxford, GB
Hyde, J., M.
Dept. of Materials, Univ. of Oxford, Oxford, GBNational Nuclear Laboratory, Didcot, GBMaterials Performance Centre, The Mill, The University of Manchester, Manchester, GB
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.