As one of the beneficial resources reclaimable from municipal solid waste incineration residues (MSWIR), we studied the resource of cement and a dechlorination system to meet the JIS standard governing chlorine content in cement. A key problem of such a system is how to remove chlorines, especially insoluble chlorines such as Friedel's salt, from MSWIR by means of a low-cost treatment system. To develop an innovative dechlori-nation system for MSWIR, a pilot plant experiment to confirm the effectiveness of organic materials as additives for the dechlorination of MSWIR was conducted using large lysimeters. In addition, to estimate the chlorine-removal efficiency and the period required for sufficient dechlorination, a numerical simulation was carried out. In cases where no organic materials had been added to MSWIR, soluble forms of chlorine could be removed, but insoluble forms of chlorine—such as Friedel's salt, remained after treatment. On the other hand, when garbage compost was present as an organic additive, both soluble and insoluble forms of chlorine could be effectively removed. The removal of insoluble forms of chlorine was made possible by the decomposition of the insoluble forms resulting from a lowering of the pH level as a result of the decomposition of organic substances, and the generation of sulfuric acid derived from the decomposition of garbage compost. As a result, the total chlorine content of MSWIR can be decreased to 0.1 % in about two years.
Author Information
Shimaoka, Takayuki
Department of Urban and Environmental Engineering, Faculty of Engineering, Kyushu University, Fukuoka, JP
Komiya, Teppei
Department of Urban and Environmental Engineering, Faculty of Engineering, Kyushu University, Fukuoka, JP
Takahashi, Fumitake
Department of Urban and Environmental Engineering, Faculty of Engineering, Kyushu University, Fukuoka, JP
Nakayama, Hirofumi
Department of Urban and Environmental Engineering, Faculty of Engineering, Kyushu University, Fukuoka, JP
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.