A high burnup boiling water reactor fuel rod was subjected to reactivity initiation accident (RIA) tests in a research reactor. Two ramp tests were carried out under almost identical irradiation conditions, resulting in cladding failure in a room temperature test, while no failure was observed in a high temperature test. An adjacent segment of the same rod was used for mechanical expansion-due-to-compression (EDC) testing simulating the pellet-cladding mechanical interaction loadings on the cladding during an in-reactor RIA. The EDC tests show the existence of a transition temperature where an abrupt increase in the specimen hoop strain at failure occurs. Additional tests revealed that the transition temperature depends on hydrogen concentration. A possible effect of the rapid heating, which is a specific condition for an in-reactor RIA compared to the static heating in the EDC tests, was verified in the rapid heating/loading tests on unirradiated hydrided Zircaloy, when both loading and heating are performed simultaneously within 50–80 ms. It was shown that strain to failure is dependent on the instantaneous material temperature and is not affected by the pre-heating history. The results show good consistency between the EDC and in-reactor pulse test data. It is concluded that the EDC test can provide valuable information to predict the in-reactor RIA fuel failure.
Author Information
Grigoriev, V.
Studsvik Nuclear AB, Nyköping, SE
Jakobsson, R.
Studsvik Nuclear AB, Nyköping, SE
Schrire, D.
Vattenfall Nuclear Fuel AB, Stockholm, SE
Ledergerber, G.
Kernkraftwerk Leibstadt AG, Leibstadt, CH
Sugiyama, T.
Nuclear Safety Research Center, Japan Atomic Energy Agency, Tokai, JP
Nagase, F.
Nuclear Safety Research Center, Japan Atomic Energy Agency, Tokai, JP
Fuketa, T.
Nuclear Safety Research Center, Japan Atomic Energy Agency, Tokai, JP
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.