It is well established that the second-phase particle (SPP) size distribution and the cladding chemical composition affects the in-reactor corrosion rate of boiling water reactor (BWR) cladding, although the mechanisms are not yet fully understood. To further study these effects, the corrosion and hydriding performance was studied on four different Zircaloy-2 materials. Three of the materials were fabricated having the same chemical composition, but different SPP distributions. The fourth material served as a reference and was manufactured to have small SPPs.
All four materials were irradiated in Forsmark 3 for five cycles to a burnup of >43 MWd/kgU, and poolside inspections were carried out after three, four, and five cycles of irradiation. Three cladding materials were studied by hot-cell investigations after three and four cycles of irradiation.
The study shows that the dissolution of the SPPs results in a shift toward smaller particles during irradiation and that the hydrogen concentration as well as the corrosion rate decrease with increasing initial SPP size. Moreover, the hydrogen content differed significantly between the examined claddings after three cycles of operation (25 MWd/kgU), whereas the oxide thickness at this burnup level was similar for all studied materials. However, the oxidation rate for the studied clad materials diverged during the fourth irradiation cycle and, consequently, the oxide layer thickness differed between the material types after four cycles of irradiation (40 MWd/kgU).
It is concluded that the initial hydrogen pickup fraction depends on the SPP size distribution of the as-fabricated material. The acceleration in corrosion rate is proposed to be a combined effect of the actual hydrogen concentration and the dissolution of the SPPs. The impact of SPP dissolution on corrosion performance and possible mechanisms behind the earlier hydrogen uptake are further discussed in the paper.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.