Pacific Northwest National Laboratory staff made in situ flow measurements in groundwater monitoring wells at the U.S. Department of Energy (DOE) Hanford Site to determine the flow direction in an aquifer with a flat water table. Given the total errors in water level elevations and a gradient of a few centimeters over 500 meters, flow directions based on the potentiometric surface are ambiguous across the 200 East Area at the Hanford Site. The colloidal borescope was used because it allows direct, real time observation of mobile colloidal particles in the open interval of a water well and, thus, avoids the use of water level data. The results characterize a complex groundwater flow pattern under several buried waste storage tank farms. The aquifer, artificially high due to the large volume of liquid discharges to the soil column from Hanford's nuclear production era, is currently receding to original conditions. The aquifer lies in unconsolidated gravel beds overlying an impermeable basalt surface that has a plucked, flood-scoured, scabland structure. The current aquifer thickness is similar to the relief on the basalt surface. Thus, the groundwater must flow around the impermeable basalt structures producing a complicated flow pattern under the waste storage unit. The original monitoring network was designed for northwest flow when the water table was held artificially high. Proper locations for new wells are dependent on our knowledge of the flow direction. The results of the colloidal borescope investigation agree with the southerly direction indicated from hydrographs, contaminant trends, other direct flow data and the general concept of a receding aquifer draining off the southern limb of a basalt anticline. Flow in the aquifer is diverted by irregular local structural highs of very low permeability basalt.
Author Information
Narbutovskih, SM
Pacific Northwest National Laboratory, Richland, WA
McDonald, JP
Pacific Northwest National Laboratory, Richland, WA
Schalla, R
Pacific Northwest National Laboratory, Richland, WA
Sweeney, MD
Pacific Northwest National Laboratory, Richland, WA
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.