The increasing age of European nuclear power plants and envisaged extensions of reactor pressure vessel (RPV) lifetimes up to 80 years require the accurate prediction and management of RPV neutron irradiation embrittlement. LONGLIFE (“Treatment of long term irradiation embrittlement effects in RPV safety assessment”) is a collaborative project of the seventh Framework Programme of EURATOM. This project has been initiated as the next step forward towards obtaining an improved understanding of irradiation effects in RPV steels under conditions representative of long term operation (LTO) of RPVs. Phenomena that might become important at high neutron fluences (such as late-blooming effects and flux effects) must be considered in detail as part of the process of upgrading safety assessments and embrittlement surveillance procedures to underwrite the safety of LTO of RPVs. The work starts with the collection and evaluation of plant-specific information and data, such as target neutron fluences for LTO and the chemical compositions of the materials. This includes a survey of available results of RPV materials data from decommissioned plants of validating surveillance data and specific irradiation effects relevant for LTO. Microstructural data are obtained from different techniques with the aim of assessing the adequacy of current dose-damage models with respect to their relevance to the mechanisms of irradiation damage associated with LTO of RPVs. Complementary mechanical tests are performed in order to address gaps in existing experimental data. Microstructural data pertaining to the evolution of irradiation damage are correlated with changes in mechanical properties, and the most important influencing factors will be identified. Surveillance guidelines for LTO of RPV base materials and welds will be developed as one of the principal outputs of the project. The scope of work and the project structure are outlined in the paper. Two LTO relevant phenomena—late blooming effect and flux effect—are discussed in more detail.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.