Standard Practice for Accelerated Conditioning of Polybutylene Pipe and Tubing for Subsequent Quality Control Testing (Withdrawn 2005)
Standard Practice for Accelerated Conditioning of Polybutylene Pipe and Tubing for Subsequent Quality Control Testing (Withdrawn 2005)F0699-00E01ASTM|F0699-00E01|en-USStandard Practice for Accelerated Conditioning of Polybutylene Pipe and Tubing for Subsequent Quality Control Testing (Withdrawn 2005)StandardF699 Standard Practice for Accelerated Conditioning of Polybutylene Pipe and Tubing for Subsequent Quality Control Testing (Withdrawn 2005)>newBOS Vol. 08.04 Committee F17
$0.00
Out of stock
Scope
1.1 This practice describes a procedure for accelerating the crystalline phase transformation of polybutylene from the metastable Form II to the stable Form I by application of hydrostatic pressure in a closed pressure vessel.
1.2 The technique can be used as an alternative to the 10-day conditioning procedure called for in Specification D 2581. The product obtained after pressure aging will be in a crystalline state, approximately that obtained by aging under Standard Laboratory Conditions.
1.3 This practice is not to be used for qualification of an extruded product for pressure rating of pipe or tubing.
1.4 The values given in parentheses are provided for information purposes only.
This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Specific precautionary statements are given in 5.2 and 6.2.
Language unavailable
Format unavailable
What is a Redline?
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
additions
deletions
and other changes between the two standards.
Save Time and Trouble!With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
PriceWhen you select the "Standard + Redline" option you get both documents! Best of all, the cost of a Standard + Redline is only slightly more than buying the Active Standard by itself.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.