Standard Practice for Building Floor Area Measurements for Facility Management (Withdrawn 2025)
Standard Practice for Building Floor Area Measurements for Facility Management (Withdrawn 2025)E1836_E1836M-09R16ASTM|E1836_E1836M-09R16|en-USStandard Practice for Building Floor Area Measurements for Facility Management (Withdrawn 2025)StandardE1836/E1836M Standard Practice for Building Floor Area Measurements for Facility Management (Withdrawn 2025)>newBOS Vol. 04.11 Committee E06
$0.00
Out of stock
ASTM International
Significance and Use
4.1 This practice can be used to facilitate comparison of areas that have been measured but it does not specify what measurements must be conducted.
4.2 This practice can be used in space programming and forecasting of space requirements.
4.3 This practice can be used to classify areas for internal cost accounting purposes.
4.4 This practice can be used to compare space use between organizations.
Scope
1.1 This practice provides a definitive procedure for measuring and classifying floor area in buildings for use in facility management, specifying occupant requirements, space planning, and for strategic facility planning.
1.2 This practice specifies the sequence in which to measure floor area.
1.3 This practice is applicable to owned, rented, and leased buildings.
1.4 Use Annex A1 to measure floor area in office facilities. The measurement practice in Annex A1 may also be suitable for use in other functional types of building which include offices, such as research, laboratory, or manufacturing buildings and building-related facilities.
1.5 The practice in Annex A1 is not intended for use in lease negotiations with owners of commercial office buildings or related properties. For that purpose, refer to the American National Standard published by the American National Standards Institute under the designation ANSI/BOMA Z65.1–1996 and commonly known as the ANSI-BOMA standard.
1.6 This practice is not intended for and not suitable for use for regulatory purposes, fire hazard assessment, and fire risk assessment.
1.7 This practice was developed for use within North America and includes some rules comparable to ISO 9836 Performance Standards in Building—Definition and Calculation of Area and Space Indicators.
1.8 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.9This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Language unavailable
Format unavailable
What is a Redline?
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
additions
deletions
and other changes between the two standards.
Save Time and Trouble!With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
PriceWhen you select the "Standard + Redline" option you get both documents! Best of all, the cost of a Standard + Redline is only slightly more than buying the Active Standard by itself.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.