Standard Practice for Use of Inorganic Process Wastes as Structural Fill
Standard Practice for Use of Inorganic Process Wastes as Structural FillE0850-95R07ASTM|E0850-95R07|en-USStandard Practice for Use of Inorganic Process Wastes as Structural FillStandardE850 Standard Practice for Use of Inorganic Process Wastes as Structural Fill>newBOS Vol. 11.04 Committee D34
$77.00
In stock
Significance and Use
This practice is intended for inorganic process wastes that can be used as replacements for natural material such as soil or rock suitable for construction applications. Selection of appropriate and feasible fill materials and selection of applicable materials, tests, and specifications to facilitate construction and environmental protection are the responsibility of the design engineer. This practice is intended to encourage wider utilization of waste materials.
Scope
1.1 This practice provides guidance for use of selected process wastes as structural fills by listing representative test methods for predicting and evaluating those physical characteristics of waste that are related to the integrity of fills and to protection of ground and surface waters.
1.2 Table 1 lists references which provide engineering practices and test procedures that may be applied to process waste for use as structural fill.
1.3 Some process wastes may produce leachate that exceeds environmentally acceptable limits. Special provisions are included to accommodate this class of materials (see 7.2).
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.