Significance and Use
The procedure described in this practice is used to design and construct an asphalt-rubber cape seal that will provide a wearing course when subjected to low to medium traffic volumes and where the pavement distress is due to block-type cracking resulting from pavement aging or reflective cracking only (not where there are clear indications of fatigue cracking due to repeated heavy axle loads).
Note 2—Block cracking is defined in Practice D 6433. See Appendix X1 for an example of block cracking due to aging.
Scope
1.1 This practice covers asphalt-rubber cape seal, which is defined as the application of an asphalt-rubber seal coat placed onto an existing pavement surface, followed by the application of a conventional Type II or III slurry seal.
Note 1—An asphalt-rubber seal coat is also known as a stress absorbing membrane (SAM) which consists of an asphalt-rubber membrane seal followed by the application of precoated aggregate chips.
1.2 An asphalt-rubber cape seal is commonly used to extend the service life of low to medium trafficked and moderately distressed asphalt-surfaced pavements. The existing pavement condition can be used to determine the application rates for the asphalt-rubber binder and aggregate as well as the aggregate gradation. Pavements in relatively poor condition will require a coarser aggregate with a higher binder application rate.
1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.