Standard Guide for Selection of Methods for Estimating Soil Loss by Erosion (Withdrawn 2019)
Standard Guide for Selection of Methods for Estimating Soil Loss by Erosion (Withdrawn 2019)D6629-01R12E01ASTM|D6629-01R12E01|en-USStandard Guide for Selection of Methods for Estimating Soil Loss by Erosion (Withdrawn 2019)StandardD6629 Standard Guide for Selection of Methods for Estimating Soil Loss by Erosion (Withdrawn 2019)>newBOS Vol. 04.09 Committee D18
$0.00
Out of stock
Significance and Use
5.1 A variety of methods exist for this measurement. Each method has its specific applicability, limitations, and levels of complexity. The users of this guide should use the descriptions of the various methods to choose the procedure, which most closely meets their needs. Most of these methods are not intended to predict sediment yield (6).
5.2 These methods are used to estimate the soil loss (in mass of soil/unit area/unit time) from rainfall and snow melt for site-specific factors due to rill and interrill erosion. These methods can not be used to estimate soil loss from ephemeral gully or channel erosion.
5.3 The estimates resulting from the methods in this guide do not constitute a design for control of erosion. However, the outputs of these methods may be important input into such a design.
Scope
1.1 This guide describes methods used for estimating soil losses due to rill and interrill erosion. All known methods for water erosion with a sediment yield component are listed. This guide provides complete reference citations for the various methods currently used to estimate soil loss by rill and interrill erosion. The referenced methods contain the rationale and detailed procedures for determining rill and interrill soil loss. For each method listed, specific applicability, limitations, and level of complexity are briefly outlined in terms of the relative spatial scale, land use, hydrology, erosion, time scale, input requirements, and output.
1.2 The referenced methods were developed for specific uses and may not be applicable in all cases. For example, some of the values derived by these methods estimate the amount of soil movement on a field without re-deposition while others account for re-deposition and estimate off-field sediment yield. Most of these methods are not intended to predict sediment yield.
1.3 Metric (SI) Units. Some of the methods in this guide are written in the preferred English units. A discussion of the conversion of the final answer to metric units is included in paragraph 6.2.
1.4 This guide offers an organized collection of information or a series of options and does not recommend a specific course of action. This guide cannot replace education or experience and should be used in conjunction with professional judgement. Not all aspects of this guide may be applicable in all circumstances. This guide is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this guide be applied without consideration of a project's many unique aspects. The word “Standard” in the title of this guide has been approved through the ASTM consensus process.
1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory requirements prior to use.
Language unavailable
Format unavailable
What is a Redline?
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
additions
deletions
and other changes between the two standards.
Save Time and Trouble!With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
PriceWhen you select the "Standard + Redline" option you get both documents! Best of all, the cost of a Standard + Redline is only slightly more than buying the Active Standard by itself.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.