Standard Practice for Use of Scrap Tires in Civil Engineering Applications
Standard Practice for Use of Scrap Tires in Civil Engineering ApplicationsD6270-98R04ASTM|D6270-98R04|en-USStandard Practice for Use of Scrap Tires in Civil Engineering ApplicationsStandardD6270 Standard Practice for Use of Scrap Tires in Civil Engineering Applications>newBOS Vol. 11.04 Committee D34
$96.00
In stock
Significance and Use
This practice is intended for use of scrap tires including tire chips or tire shreds comprised of pieces of scrap tires, tire chip/soil mixtures, tire sidewalls, and whole scarp tires in civil engineering applications. This practice includes the use of tire chips, tire shreds, and tire chip/soil mixtures as lightweight embankment fill, lightweight retaining wall backfill, drainage layers, thermal insulation to limit frost penetration beneath roads, insulating backfill to limit heat loss from buildings, and replacement for soil or rock in other fill applications. Use of whole scrap tires and tire sidewalls includes construction of retaining walls and drainage culverts, as well as use as fill when whole tires have been compressed into bales. It is the responsibility of the design engineer to determine the appropriateness of using scrap tires in a particular application and to select applicable tests and specifications to facilitate construction and environmental protection. This practice is intended to encourage wider utilization of scrap tires in civil engineering applications.
Three tire shred fills with thicknesses in excess of 7 m have experienced a serious heating reaction; however, more than 70 fills with a thickness less than 3 m have been constructed with no evidence of a deleterious heating reaction (1)6 . Guidelines have been developed to minimize internal heating of tire shred fills (2) as discussed in 6.10. The guidelines are applicable to fills less than 3 m thick; thus, this practice should be applied only to tire shred fills less than 3 m thick.
Scope
1.1 This practice provides guidance for testing the physical properties and gives data for assessment of the leachate generation potential of processed or whole scrap tires in lieu of conventional civil engineering materials, such as stone, gravel, soil, sand, or other fill materials. In addition, typical construction practices are outlined.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.