Standard Guide for Application of New Spray Applied Polyurethane Foam and Coated Roofing Systems (Withdrawn 2021)
Standard Guide for Application of New Spray Applied Polyurethane Foam and Coated Roofing Systems (Withdrawn 2021)D5469_D5469M-12ASTM|D5469_D5469M-12|en-USStandard Guide for Application of New Spray Applied Polyurethane Foam and Coated Roofing Systems (Withdrawn 2021)StandardD5469/D5469M Standard Guide for Application of New Spray Applied Polyurethane Foam and Coated Roofing Systems (Withdrawn 2021)>newBOS Vol. 04.04 Committee D08
$86.00
In stock
ASTM International
Significance and Use
4.1 This guide outlines general procedures and precautions necessary for correct and safe application of spray applied polyurethane foam roofing systems.
4.2 This guide is not all-inclusive; this guide is intended only to supplement detailed instructions from manufacturers and safety requirements established by law.
4.3 Refer to Polyurethane Foam Contractors Alliance AY-104 and NRCA Spray Polyurethane Foam-Based Manual for industry guidelines.
Scope
1.1 This guide covers the application of new roofing systems consisting of spray applied polyurethane foam insulation, elastomeric protective coatings, and optional mineral granules. This guide does not apply to retrofit or remedial applications.
1.2 Design criteria associated with the installation of spray in place polyurethane foam are beyond the scope of this specification.
1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.