The store will not work correctly when cookies are disabled.
Due to scheduled maintenance, select standards and products will be unavailable for purchase beginning Thursday, December 4, 2025, at 12:00 a.m. Eastern (GMT-5) ending Friday, December 12, 2025 at approximately 12:00 p.m. Eastern (GMT-5).
Using Artificial Intelligence (AI) on ASTM standards and related intellectual property is prohibited. Violations will result in suspension of access.
Standard Test Method for Piles Under Lateral Loads (Withdrawn 2005)
Standard Test Method for Piles Under Lateral Loads (Withdrawn 2005)D3966-90R95ASTM|D3966-90R95|en-USStandard Test Method for Piles Under Lateral Loads (Withdrawn 2005)StandardD3966 Standard Test Method for Piles Under Lateral Loads (Withdrawn 2005)>newBOS Vol. 04.08 Committee D18
$0.00
Out of stock
Scope
1.1 This test method covers procedures for testing vertical and batter piles either individually or in groups to determine the load-defection relationship when subjected to lateral loading. It is applicable to all deep foundation units regardless of their size or method of installation. This test method is divided into the following sections:
Section Referenced Documents 2 Significance and Use 3 Apparatus for Applying Loads 4 Apparatus for Measuring Movements 5 Loading Procedures 6 Procedures for Measuring Movements 7 Safety Requirements 8 Report 9 Precision and Bias 10
1.2 This test method only describes procedures for testing single piles or pile groups. It does not cover the interpretation or analysis of the test results or the application of the test results to foundation design or the use of empirical or analytic procedures for determining the magnitude and variation of the coefficient of horizontal subgrade reaction, bending stresses, and bending movements over the length of the pile. The term "failure" as used in this test method indicates a rapid progressive lateral movement of the pile or pile group under a constant or decreasing load.
1.3 Apparatus and procedures designated "optional" are to be required only when included in the project specifications and, if not specified, may be used only with the approval of the engineer responsible for the foundation design. The word "shall" indicates a mandatory provision and "should" indicates a recommended or advisory provision. Imperative sentences indicate mandatory provisions. Notes and illustrations included herein are explanatory or advisory.
1.4 The values stated in inch-pound units are to be regarded as the standard.
1.5 This standard does not purport to address all of the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific safety precautions, see Section 8.
Language unavailable
Format unavailable
What is a Redline?
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
additions
deletions
and other changes between the two standards.
Save Time and Trouble!With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
PriceWhen you select the "Standard + Redline" option you get both documents! Best of all, the cost of a Standard + Redline is only slightly more than buying the Active Standard by itself.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.