Standard Historical Last Updated: Aug 16, 2017 Track Document
ASTM C1188-91(1997)e1

Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities

Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities C1188-91R97E01 ASTM|C1188-91R97E01|en-US Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities Standard new BOS Vol. 12.01 Committee C26
$ 83.00 In stock

Scope

1.1 This guide provides guidance and recommended practices for establishing a comprehensive quality assurance program for uranium conversion facilities.

1.2 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate health and safety practices and determine the applicability of regulatory limitations prior to use. 

1.3 The basic elements of a quality assurance program appear in the following order:

FUNCTION SECTION Organization 5 Quality Assurance Program 6 Design Control 7 Instructions, Procedures ∧ Drawings 8 Document Control 9 Procurement 10 Identification and Traceability 11 Processes 12 Inspection 13 Control of Measuring and Test Equipment 14 Handling, Storage and Shipping 15 Inspection, Test and Operating Status 16 Control of Nonconforming Items 17 Corrective Actions 18 Quality Assurance Records 19 Audits 20
Price:
Contact Sales
Related
Reprints and Permissions
Reprints and copyright permissions can be requested through the
Copyright Clearance Center
Details
Book of Standards Volume: 12.01
Developed by Subcommittee: C26.08
Pages: 8
DOI: 10.1520/C1188-91R97E01
ICS Code: 03.120.10; 27.120.30