The store will not work correctly when cookies are disabled.
Due to scheduled maintenance, select standards and products will be unavailable for purchase beginning Thursday, December 4, 2025, at 12:00 a.m. Eastern (GMT-5) ending Friday, December 12, 2025 at approximately 12:00 p.m. Eastern (GMT-5).
Due to scheduled maintenance, select standards and products will be unavailable for purchase beginning Thursday, December 4, 2025, at 12:00 a.m. Eastern (GMT-5) ending Friday, December 12, 2025 at approximately 12:00 p.m. Eastern (GMT-5).
Using Artificial Intelligence (AI) on ASTM standards and related intellectual property is prohibited. Violations will result in suspension of access.
Standard Guide for Establishing Surveillance Test Program for Boron-based Neutron Absorbing Material Systems for Use in Nuclear Fuel Storage Racks in Pool Environment
Standard Guide for Establishing Surveillance Test Program for Boron-based Neutron Absorbing Material Systems for Use in Nuclear Fuel Storage Racks in Pool EnvironmentC1187-20ASTM|C1187-20|en-USStandard Guide for Establishing Surveillance Test Program for Boron-based Neutron Absorbing Material Systems for Use in Nuclear Fuel Storage Racks in Pool EnvironmentStandardC1187 Standard Guide for Establishing Surveillance Test Program for Boron-based Neutron Absorbing Material Systems for Use in Nuclear Fuel Storage Racks in Pool Environment>newBOS Vol. 12.01 Committee C26
$77.00
In stock
Significance and Use
4.1 The storage of nuclear fuel in high-density storage racks is dependent upon the functionality and integrity of an absorber between the stored fuel assemblies to ensure that the reactivity of the storage configuration does not exceed the K-effective allowed by applicable regulations. A confirmation test may be required to verify the functionality and integrity of the absorber within the racks. If establishing a surveillance program for newly installed or existing absorber material in fuel racks, the following methods are suggested: (a) coupon monitoring program (if coupons are available), (b) in-situ neutron attenuation test, and (c) other applicable in-situ tests such as visual inspection or drag test.
4.2 This guide provides guidance for establishing and conducting a surveillance program for monitoring the ongoing functionality and integrity of the absorbers.
Scope
1.1 This guide provides guidance for establishing a surveillance test program to monitor the performance of boron-based neutron absorbing material systems (absorbers) necessary to maintain sub-criticality in nuclear fuel storage racks in a pool environment. The practices presented in this guide, when implemented, will provide a comprehensive surveillance test program to verify the functionality and integrity of the neutron absorbing material within the storage racks. The performance of a surveillance test program provides added assurance of the safe and effective operation of a high-density storage facility for nuclear fuel. There are several different techniques for surveillance testing of boron-based neutron absorbing materials. This guide focuses on coupon monitoring and in-situ testing.
1.2This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.3This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.