Standard Specification for Underground Precast Concrete Utility Structures
Standard Specification for Underground Precast Concrete Utility StructuresC0858-09ASTM|C0858-09|en-USStandard Specification for Underground Precast Concrete Utility StructuresStandardC858 Standard Specification for Underground Precast Concrete Utility Structures>newBOS Vol. 04.05 Committee C27
$77.00
In stock
Abstract
This specification covers the recommended design criteria and manufacturing practices for monolithic or sectional precast concrete utility structures. Forms shall be accurately constructed and strong enough to maintain the structure's dimensions within the tolerances. Forms shall be cleaned before each use. The aggregates shall be sized, graded, proportioned, and thoroughly mixed in a batch mixer with proportions of cement and water as will produce a homogeneous concrete having the required specified compressive strength. Concrete shall be deposited as nearly as practicable in its final position. Structures shall be cured by an accepted industry method that will develop the required 28-day compressive strength without affecting the long-term durability of the concrete. The elastic method of structural design or the strength design method of reinforced concrete design, shall be used to design the concrete sections, including the reinforcement required, when the structure is subjected to the specified loading conditions. The structural design shall take into consideration the number, placement, and size of access openings. The minimum floor thickness resulting from slope shall be considered as the nominal floor thickness in the design of the structure. Duct terminators, knockouts, and sumps shall be designed to carry the loads imposed upon them. Compressive-strength of the concrete shall be tested to meet the requirements prescribed. Joints in sectional precast concrete structure shall be designed so as to be self-aligning when assembling sections of the structure. Design of lifting devices shall conform to requirements specified.
Scope
1.1 This specification covers the recommended design criteria and manufacturing practices for monolithic or sectional precast concrete utility structures. Concrete pipe and box culverts are not covered under this specification. Also, precast concrete manholes covered in Specification C 478 are excluded from this specification.
1.2 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.