Standard Practice for Use of Chemical-Resistant Resin Mortars (Withdrawn 2021)C0399-98R12ASTM|C0399-98R12|en-USStandard Practice for Use of Chemical-Resistant Resin Mortars (Withdrawn 2021)StandardC399 Standard Practice for Use of Chemical-Resistant Resin Mortars (Withdrawn 2021)>newBOS Vol. 04.05 Committee COS
$0.00
Out of stock
Abstract
This practice provides information on the handling and proper use of chemical-resistant resin mortars. For hand mixing, a shallow mortar box should be provided. The equipment for power-mixing ranges from small mixers to simple heaters used on low-speed motors. Also, the equipment may be required for heating or cooling materials as conditions dictate. For hand mixing, the liquid shall be measured into the mortar box then stir the powder in gradually, working out all lumps and air bubbles. Mix with a mason's trowel or other suitable tool. On the other hand, for power mixing, the liquid shall be measured into the container and mix in the powder gradually and uniformly. No additives such as sand, Portland cement, or water should be added and containers of resins and powders should be closed when not being used. After mixing, mortar should be transferred immediately from the mixing vessel and spread in a thin layer on the mortar pan, as mortar heats up during setting and thick layers or large masses retain this heat. Retained heat shortens the working time. Mixed mortar that has become unworkable shall not be retempered with resin liquid but shall be discarded. After transferring, laying chemical-resistant brick or tile shall be done. The brick or tile shall be dried. The mortars shall be cleaned from chemical-resistant brick or tile and resin mortars shall be cured at normal temperatures afterwards.
Scope
1.1 This practice provides information on the handling and proper use of chemical-resistant resin mortars such as those covered in Specification C395.
Note 1—Resin mortars and grouts are differentiated as follows: resin grouts are applied to the joints, generally 1/4 in. (6 mm) wide, after the brick or tile are set in place (grouting or tile setter's method). Resin mortars are troweled onto the brick or tile, generally in a 1/8 in. (3 mm) thickness, before the brick are laid in place (buttering or bricklayer's method). Refer to Practice C723.
1.2 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Specific precautions are given in Sections 5 and 5.2.
Language unavailable
Format unavailable
What is a Redline?
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
additions
deletions
and other changes between the two standards.
Save Time and Trouble!With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
PriceWhen you select the "Standard + Redline" option you get both documents! Best of all, the cost of a Standard + Redline is only slightly more than buying the Active Standard by itself.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.