Standard Practice for Use of Hydraulic Cement Mortars in Chemical-Resistant Masonry (Withdrawn 2021)
Standard Practice for Use of Hydraulic Cement Mortars in Chemical-Resistant Masonry (Withdrawn 2021)C0398-98R12ASTM|C0398-98R12|en-USStandard Practice for Use of Hydraulic Cement Mortars in Chemical-Resistant Masonry (Withdrawn 2021)StandardC398 Standard Practice for Use of Hydraulic Cement Mortars in Chemical-Resistant Masonry (Withdrawn 2021)>newBOS Vol. 04.05 Committee COS
$0.00
Out of stock
ASTM International
Abstract
This practice provides recommendations for use of hydraulic cement mortars for chemical-resistant masonry construction. For Portland and Portland blast-furnace slag cements, no calcium aluminate cement, lime, or admixture shall be mixed with these cements, in the mortar batch or in the mixing water. On the other hand, no Portland or Portland blast-furnace slag cements, lime, or admixture shall be mixed with calcium aluminate cement, in the mortar batch or in the mixing water. The brick shall be clean and protected from frost damage. Materials proportions shall be in accordance with the requirements indicated in this standard practice. The mixing water shall be approximately neutral and shall be potable. During the preparation of concrete fill or sub-base in new construction, the surface of the concrete fill shall be free of mortar drippings and projecting joints. Acceptable surface texture requirement is indicated in this standard practice. All dirt, dust, loose particles, surface laitance, and debris shall be removed from the concrete fill or sub-base by vigorous brooming, vacuuming, or other means. The surface must be free of grease, oil, or wax deposits. Wood or metal strips shall be used to gage the thickness of the setting bed. Several hours before placing the setting bed, the prepared concrete surface shall be thoroughly saturated with clean water. When required, the expansion joint strips shall be located and set in position. All equipment shall be clean and free of other cement, lime, and plaster, prior to mixing and placing setting bed. Grouting shall be done as soon as possible after the initial set has taken place in the setting bed. It is essential that hydraulic cement mortar or grout joints be properly cured to ensure maximum retention of the mixing water.
Scope
1.1 This practice provides recommendations for use of hydraulic cement mortars for chemical-resistant masonry construction.
1.2 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Language unavailable
Format unavailable
What is a Redline?
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
additions
deletions
and other changes between the two standards.
Save Time and Trouble!With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
PriceWhen you select the "Standard + Redline" option you get both documents! Best of all, the cost of a Standard + Redline is only slightly more than buying the Active Standard by itself.
Domestic orders are delivered via United Parcel Service (UPS) or United States Postal Service (USPS). Transit
times average 3 to 5 business days. Please be aware that UPS will not deliver packages to Post Office Boxes.
International orders are delivered via courier post services which can be either a postal service, courier
service, or a combination of both. Standard Service is untraceable. Please allow 4-7 weeks for delivery.
Please be aware that carriers will not deliver packages to Post Office Boxes. Because of the variability of
customs processes and procedures in different countries, ASTM International cannot guarantee transit times to
international destinations. Customs duty and taxes are the responsibility of the consignee.
Shipping & Handling charges follow the rate schedule, below:
Order Total
Shipping & Handling Fee (US Domestic)
Up to $50.00
$18.72
$50.01 to $100.00
$20.80
$100.01 to $150.00
$29.52
$150.01 to $250.00
$39.09
$250.01 to $500.00
$56.25
$500.01 to $750.00
$76.42
$750.01 to $1000.00
$93.15
$1000.01 to $1500.00
$121.27
$1500.01 to $2500.00
$158.38
$2500.01 to $4999.00
$209.04
$5000.00 to higher
FREE
Order Total
Shipping & Handling Fee (International)
Up to $50.00
$68.72
$50.01 to $100.00
$70.80
$100.01 to $150.00
$79.52
$150.01 to $250.00
$89.09
$250.01 to $500.00
$106.25
$500.01 to $750.00
$126.42
$750.01 to $1000.00
$143.15
$1000.01 to $1500.00
$171.27
$1500.01 to $2500.00
$208.38
$2500.01 to $4999.00
$259.04
$5000.00 to higher
FREE
Shipping and Handling charges are approximate. Additional charges may be incurred if your order requires multiple shipments. This does not apply to complete sets and sections.